Research Papers

Analyses of the Control System Strategies and Methodology for Part Power Control of the Simple and Intercooled Recuperated Brayton Helium Gas Turbine Cycles for Generation IV Nuclear Power Plants

[+] Author and Article Information
A. Gad-Briggs

Gas Turbine Engineering Group,
Cranfield University,
Cranfield MK43 0AL, Bedfordshire, UK
e-mail: a.a.gadbriggs@cranfield.ac.uk

P. Pilidis

Gas Turbine Engineering Group,
Cranfield University,
Cranfield MK43 0AL, Bedfordshire, UK
e-mail: p.pilidis@cranfield.ac.uk

T. Nikolaidis

Gas Turbine Engineering Group,
Cranfield University,
Cranfield MK43 0AL, Bedfordshire, UK
e-mail: t.nikolaidis@cranfield.ac.uk

Manuscript received December 22, 2016; final manuscript received May 10, 2017; published online July 31, 2017. Assoc. Editor: John F. P. de Grosbois.

ASME J of Nuclear Rad Sci 3(4), 041016 (Jul 31, 2017) (9 pages) Paper No: NERS-16-1170; doi: 10.1115/1.4036737 History: Received December 22, 2016; Revised May 10, 2017

An important requirement for Generation IV Nuclear Power Plant (NPP) design is the control system, which enables part power operability. The choices of control system methods must ensure variation of load without severe drawbacks on cycle performance. The objective of this study is to assess the control of the NPP under part power operations. The cycles of interest are the simple cycle recuperated (SCR) and the intercooled cycle recuperated (ICR). Control strategies are proposed for NPPs but the focus is on the strategies that result in part power operation using the inventory control method. First, results explaining the performance and load limiting factors of the inventory control method are documented; subsequently, the transient part power performances are also documented. The load versus efficiency curves were also derived from varying the load to understand the efficiency penalties. This is carried out using a modeling and performance simulation tool designed for this study. Results show that the ICR takes ∼102% longer than the SCR to reduce the load to 50% in design point (DP) performance conditions for similar valve flows, which correlates with the volumetric increase for the ICR inventory tank. The efficiency penalties are comparable for both cycles at 50% part power, whereby a 22% drop in cycle efficiency was observed and indicates limiting time at very low part power. The analyses intend to aid the development of cycles for Generation IV NPPs specifically gas cooled fast reactors (GFRs) and very high-temperature reactors (VHTRs), where helium is the coolant.

FIGURES IN THIS ARTICLE
<>
Copyright © 2017 by ASME
Your Session has timed out. Please sign back in to continue.

References

Carre, F. , Yvon, P. , Anzieu, P. , Chauvin, N. , and Malo, J.-Y. , 2010, “ Update of the French R&D Strategy on Gas-Cooled Reactors,” Nucl. Eng. Des., 240(10), pp. 2401–2408. [CrossRef]
Locatelli, G. , Mancini, M. , and Todeschini, N. , 2013, “ Generation IV Nuclear Reactors: Current Status and Future Prospects,” Energy Policy, 61, pp. 1503–1520. [CrossRef]
Gad-Briggs, A. , and Pilidis, P. , 2017, “ Analyses of Simple and Intercooled Recuperated Direct Brayton Helium Gas Turbine Cycles for Generation IV Reactor Power Plants,” ASME J. Nucl. Eng. Radiat. Sci., 3(1), p. 011017. [CrossRef]
Gad-Briggs, A. , Pilidis, P. , and Nikolaidis, T. , 2017, “ A Review of the Turbine Cooling Fraction for Very High Turbine Entry Temperature Helium Gas Turbine Cycles for Generation IV Reactor Power Plants,” ASME J. Nucl. Eng. Radiat. Sci., 3(2), p. 021007. [CrossRef]
Pradeepkumar, K. N. , Tourlidakis, A. , and Pilidis, P. , 2001, “ Analysis of 115MW, 3-Shaft, Helium Brayton Cycle Using Nuclear Heat Source,” ASME Paper No. 2001-GT-0523.
Pradeepkumar, K. N. , Tourlidakis, A. , and Pilidis, P. , 2001, “ Design and Performance Review of PBMR Closed Cycle Gas Turbine Plant in South Africa,” International Joint Power Generation Conference, New Orleans, LA, June 4–7.
Pradeepkumar, K. N. , Tourlidakis, A. , and Pilidis, P. , 2001, “ Performance Review: PBMR Closed Cycle Gas Turbine Power Plant,” Technical Committee Meeting on HTGR—Power Conversion Systems, International Atomic Energy Agency (IAEA), Nov. 14–16, 2000, pp. 99–112. https://inis.iaea.org/search/search.aspx?orig_q=RN:32047835
Sato, H. , Yan, X. , Ohashi, H. , Tachibana, Y. , and Kunitomi, K. , 2012, “ Control Strategies for VHTR Gas-Turbine System With Dry Cooling,” ASME Paper No. ICONE20-POWER2012-54351.
Gad-Briggs, A. , and Pilidis, P. , 2017, “ Analyses of Off-Design Point Performances of Simple and Intercooled Brayton Helium Recuperated Gas Turbine Cycles for Generation IV Nuclear Power Plants,” 25th International Conference on Nuclear Engineering (ICONE), Shanghai, China, May 14–18, Paper No. ICONE25-67714.
Gad-Briggs, A. , Nikolaidis, T. , and Pilidis, P. , 2017, “ Analyses of the Effect of Cycle Inlet Temperature on the Precooler and Plant Efficiency of the Simple and Intercooled Helium Gas Turbine Cycles for Generation IV Nuclear Power Plants,” Appl. Sci., 7(4), p. 319. [CrossRef]
Gad-Briggs, A. , and Pilidis, P. , 2017, “ Analyses of the Off-Design Point Performance of a High Pressure Ratio Intercooled Brayton Helium Gas Turbine Cycle for Generation IV Nuclear Power Plants,” 25th International Conference on Nuclear Engineering (ICONE), Shanghai, China, May 14–18, Paper No. ICONE25-67715.
Yan, X. , Kunitomi, K. , Nakata, T. , and Shiozawa, S. , 2003, “ GTHTR300 Design and Development,” Nucl. Eng. Des., 222(2–3), pp. 247–262. [CrossRef]
Bammert, K. , Krey, G. , and Krapp, R. , 1974, “ Operation and Control of the 50 MW Closed-Cycle Helium Turbine Oberhausen,” ASME Paper No. 74-GT-13.
Openshaw, F. , Estrine, E. , and Croft, M. , 1976, “ Control of a Gas Turbine HTGR,” ASME Paper No. 76-GT-97.
Covert, R. E. , Krase, J. M. , and Morse, D. C. , 1974, “ Effect of Various Control Modes on the Steady-State Full and Part Load Performance of a Direct-Cycle Nuclear Gas Turbine Power Plant,” ASME Paper No. 74-WA/GT-7.
Sato, H. , Yan, X. , Tachibana, Y. , and Kato, Y. , 2012, “ Assessment of Load-Following Capability of VHTR Cogeneration Systems,” Ann. Nucl. Energy, 49, pp. 33–40. [CrossRef]
Bammert, K. , and Krey, G. , 1971, “ Dynamic Behaviour and Control of Single-Shaft Closed-Cycle Gas Turbines,” ASME J. Eng. Power, 93(4), pp. 447–453. [CrossRef]
Kulhanek, M. , and Dostal, V. , 2007, “ Supercritical Carbon Dioxide Cycles. Thermodynamic Analysis and Comparison,” Czech Technical University Prague, Prague, Czech Republic.
Baxi, C. B. , Shenoy, A. , Kostin, V. I. , Kodochigov, N. G. , Vasyaev, A. V. , Belov, S. E. , and Golovko, V. F. , 2008, “ Evaluation of Alternate Power Conversion Unit Designs for the GT-MHR,” Nucl. Eng. Des., 238(11), pp. 2995–3001. [CrossRef]
Gad-Briggs, A. , Pilidis, P. , and Nikolaidis, T. , 2017, “ Analyses of a High Pressure Ratio Intercooled Direct Brayton Helium Gas Turbine Cycle for Generation IV Reactor Power Plants,” ASME J. Nucl. Eng. Radiat. Sci., 3(1), p. 011021.
Pitts, D. R. , and Sissom, L. E. , 1997, Theory and Problems of Heat Transfer, 2nd ed., McGraw-Hill, New York.
Navarro, H. A. , and Cabezas-Gomez, L. C. , 2007, “ Effectiveness-NTU Computation With a Mathematical Model for Cross-Flow Heat Exchangers,” Braz. J. Chem. Eng., 24(4), pp. 509–521. [CrossRef]
Sato, H. , Yan, X. L. , Tachibana, Y. , and Kunitomi, K. , 2014, “ GTHTR300—A Nuclear Power Plant Design With 50% Generating Efficiency,” Nucl. Eng. Des., 275, pp. 190–196. [CrossRef]
Kyprianidis, K. G. , 2010, “ Multi-Disciplinary Conceptual Design of Future Jet Engine Systems,” Ph.D. thesis, Cranfield University, Cranfield, UK. https://dspace.lib.cranfield.ac.uk/handle/1826/8041
Decher, R. , 1994, Energy Conversion, Systems, Flow Physics and Engineering, Oxford University Press, Oxford, UK.
Frutschi, H. U. , 2005, Closed-Cycle Gas Turbines, ASME Press, New York. [CrossRef]

Figures

Grahic Jump Location
Fig. 3

SCR with inventory pressure control schematic

Grahic Jump Location
Fig. 4

Compressor map showing corrected speed lines and contours of efficiency [24]

Grahic Jump Location
Fig. 5

Effect of mass change on cycle and tank pressures

Grahic Jump Location
Fig. 6

Transient part power performance (T1 at DP)

Grahic Jump Location
Fig. 7

Part power versus plant cycle efficiency curves (T1 at DP)

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In