Under the current trend of globalization, companies develop products not only to target a single market but to sell them to the entire world. Companies realize the importance of collaborative design, or workshare, to develop global regional engineering centers to balance design variations while ensuring local market success. This paradigm shift enables diverse customer values to be integrated into products but also introduces challenges in the management of work distribution. Extensive industry case studies have shown that capability and capacity of the regional centers drive the workshare decisions; however, this strategy overlooks the interdependence of the design systems causing many delays and quality problems. Seeing the opportunity, this paper presents a method to identify and to quantify the system-level workshare risk based on the couplings of system components to evaluate the overall workshare scenarios. The risk analysis consists of two key elements in terms of two relationships, the division of work for distributions (i.e., component coupling) and the work assignments of the distributed teams (i.e., workshare coupling), as well as an algorithm to combine the relationships to calculate the workshare risk. To illustrate the steps of the risk analysis, this paper applies it to a hair dryer design as a case study. The paper also discusses the usages and characteristics of the risk analysis, and concludes with the future research and the next steps of generalizing the method to other product development projects.
Skip Nav Destination
e-mail: pleung@stanfordalumni.org
e-mail: ishii@stanford.edu
Article navigation
Research Papers
Distributed System Development Risk Analysis
Peter Leung,
Peter Leung
Department of Mechanical Engineering,
e-mail: pleung@stanfordalumni.org
Stanford University
, Stanford, CA 94305-4022
Search for other works by this author on:
Kosuke Ishii,
Kosuke Ishii
Department of Mechanical Engineering,
e-mail: ishii@stanford.edu
Stanford University
, Stanford, CA 94305-4022
Search for other works by this author on:
Jan Benson
Jan Benson
Search for other works by this author on:
Peter Leung
Department of Mechanical Engineering,
Stanford University
, Stanford, CA 94305-4022e-mail: pleung@stanfordalumni.org
Kosuke Ishii
Department of Mechanical Engineering,
Stanford University
, Stanford, CA 94305-4022e-mail: ishii@stanford.edu
Jeffrey Abell
Jan Benson
J. Mech. Des. May 2008, 130(5): 051403 (9 pages)
Published Online: March 25, 2008
Article history
Received:
January 8, 2007
Revised:
October 3, 2007
Published:
March 25, 2008
Citation
Leung, P., Ishii, K., Abell, J., and Benson, J. (March 25, 2008). "Distributed System Development Risk Analysis." ASME. J. Mech. Des. May 2008; 130(5): 051403. https://doi.org/10.1115/1.2885196
Download citation file:
Get Email Alerts
Related Articles
Harnessing Experience for Efficient Medical Device Product Development
J. Med. Devices (June,2009)
Risk Assessment Methodology for Electric-Current Induced Drowning Accidents
ASME J. Risk Uncertainty Part B (September,2016)
Risk Analysis for the Urban Buried Gas Pipeline With Fuzzy Comprehensive Assessment Method
J. Pressure Vessel Technol (April,2012)
Call for papers: Third ASRANet-2006, International Colloquium: Integration of Structural Analysis, Risk, and Reliability.
J. Offshore Mech. Arct. Eng (May,2005)
Related Proceedings Papers
Related Chapters
Identification and Analysis of Risk
Managing Risks in Design & Construction Projects
QRAS Approach to Phased Mission Analysis (PSAM-0444)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Corrosion Risk Analysis
Corrosion and Materials in Hydrocarbon Production: A Compendium of Operational and Engineering Aspects